Resolution No. 467773
RESOLUTION NO. 4677
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CYPRESS
ESTABLISHING PROJECT PRIORITIES FOR THE PROPOSED
10 MILLION DOLLAR STORM DRAIN BOND ISSUE
WHEREAS, the City of Cypress has always been committed to the provision of drainage
improvements at the levels necessary to provide standard 10 and 100 year event flood protection;
and,
WHEREAS, the residents of Cypress demonstrated this commitment by voting for a
storm drain bond issue on April 9, 1968, to construct drainage improvements identified in the
City's Master Plan of Drainage; and,
WHEREAS, the 1994 update of the City's Master Plan of Drainage has identified the
need for additional drainage improvements; and,
WHEREAS, the City Council of the City of Cypress has placed on the November 5,
1996, ballot a 10 million dollar storm drain bond issue to construct these additional drainage
improvements; and,
WHEREAS, the City Council of the City of Cypress desires to identify which projects
identified in the 1994 Master Plan of Drainage are proposed to be constructed with the proceeds
if the bond issue is passed, and in what priority they are to be constructed.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CYPRESS DOES
HEREBY RESOLVE AS FOLLOWS:
1. That the drainage projects to be constructed with the proceeds, if the proposed 1996
storm drain bond issue is passed, are as follows listed in order of priority:
1. Nature Park Retarding Basin Relief Drain
2. Newman Street Drain
3. Ball Road /Grindlay Street Drain
4. Crescent Avenue Drain
5. Orangewood Avenue Drain
6. Halawa Lane Drain
7. East Larwin Avenue Drain
8. Moody Street Drain
9. Walker Street Drain
10. Ritter Street /Jonathan Avenue Drain
11. West Larwin Avenue Drain
12. West Myra Avenue Drain
13. East Myra Avenue Drain
14. Carbon Creek Channel Connector
$ 3,000,000
$ 1,512,000
$ 930,000
$ 530,000
$ 258,000
$ 105,000
$ 320,000
$ 530,000
$ 973,000
$ 376,000
$ 212,000
$ 712,000
$ 887,000
$ 43,000
Total: $10,000,000
2. That the above listed projects are more fully described on Attachment "A ", said
attachment hereby incorporated into this Resolution.
3. That the bond issued for the above projects would have a maximum interest rate of 7%
per annum, have a term of 25 years and maximum tax rate of 0.0288%.
PASSED AND ADOPTED by the City Council of the City of Cypress at a special
meeting held on the 8th day of August, 1996.
MAYOR OF THE CITY OF CYPRESS
74
ATTEST:
CITY CLERK OF THE CITY OF CYPRESS
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
I, LILLIAN M. HAINA, City Clerk of the City of Cypress, DO HEREBY CERTIFY
that the foregoing Resolution was duly adopted at a special meeting of the said City Council held
on the 8th day of August, 1996, by the following roll call vote:
AYES: 3 COUNCIL MEMBERS: Jones, Kerry and Bowman
NOES: 0 COUNCIL MEMBERS: None
ABSENT: 2 COUNCIL MEMBERS: Age and Carroll
oh -4,k,
CITY CLERK OF THE CITY OF CYPRESS
CITY OF CYPRESS
COUNTY OF ORANGE, CALIFORNIA
ATTACHMENT "A" 7 5
LOS ALAMITOS DOLT MASS
76
ATTACHMENT "A -1"
CRESCENT AVENUE DRAIN
Estimated cost: $530,000
Proposed improvements: Replace existing 30 inch pipe with 42 inch
pipe. Construct an additional 2000 feet of pipe ranging in size
from 24 to 42 inches.
MOODY STREET DRAIN
Estimated cost: $497,000
Proposed improvements: Replace existing 42 inch pipe with 66 inch
pipe. Construct an additional 1000 feet of pipe ranging in size
from 24 to 42 inches.
WALKER STREET DRAIN
Estimated cost: $973,000
Proposed improvements: Construct 3400 feet of pipe ranging in size
from 24 to 69 inches.
NEWMAN STREET DRAIN
Estimated cost: $1,512,000
Proposed improvements: Replace existing 42 inch pipe with 60 inch
pipe. Construct an additional 2600 feet of pipe ranging in size
from 27 to 39 inches.
NATURE PARK RETARDING BASIN RELIEF DRAIN
Estimated cost: $3,000,000
Proposed improvements: Construct an additional pump station in the
retarding basin and related pipe to Carbon Creek Channel.
WEST LARWIN AVENUE DRAIN
Estimated Cost: $212,000
Proposed improvements: Construct approximately 700 feet of 33 inch
pipe. This project is only feasible with the implementation of the
retarding basin project as it will drain into the retarding basin.
ATTACHMENT "A -2" 7 1
EAST LARWIN AVENUE DRAIN
Estimated Cost: $320,000
Proposed improvements: Construct approximately 1100 feet of 36 to
42 inch pipe. This project will drain into the recently completed
pump station at Veterans Park. Construction of this project will
provide added relief to the Nature Park Retarding Basin.
BALL RD \GRINDLAY AVE DRAIN
Estimated Cost: $930,000
Proposed improvements: Construct approximately 3400 feet of 33 to
66 inch pipe.
CARBON CREEK CHANNEL CONNECTOR
Estimated Cost: $43,000
Proposed improvements: Construct approximately 215 feet of 30 inch
pipe.
WEST MYRA AVENUE DRAIN
Estimated Cost: $712,000
Proposed improvements: Construct approximately 2900 feet of 24 to
51 inch pipe.
EAST MYRA AVENUE DRAIN
Estimated Cost: $887,000
Proposed improvements: Construct approximately 2800 feet of 36 to
66 inch pipe.
RITTER ST \JONATHAN AVE DRAIN
Estimated Cost: $376,000
Proposed improvements: Construct approximately 1600 feet of 21 to
51 inch pipe.
78
ATTACHMENT "A -3"
ORANGEWOOD AVE DRAIN
Estimated Cost: $258,000
Proposed improvements: Construct approximately 720 feet of 33 inch
pipe and related inlets.
HALAWA AVE DRAIN
Estimated Cost: $105,000
Proposed improvements: Construct approximately 400 feet of 30 inch
pipe and related inlets.